+44 (0)28 37511911
info@gmacutilities.com

Our objective to drill in a 63mm and 160mm PE pipe across two fairways and a public road crossing with the minimum disruption to the golf course. The purpose of the pipes was to provide a water supply for the new irrigation sprinkler watering system. The work was carried out on behalf of Arden Lea Irrigation and the Client Pyle & Kenfig Golf Course.

 

 

Constructionline Gold Member Gmac Utilities Ltd has been assessed and has met the bronze level
requirements of the Fleet Operator Recognition Scheme
(FORS). GMAC Utilities Ltd Has achieved the following standards through assessment for Safety, Health,
Environmental & Quality practices and procedures as a registered supplier on Verify
Category B2

Gmac Utilities are currently working towards ISO accreditation