Do You Have A Construction Project We Can Help With?
Lincolnshire
Gmac Utilities Ltd never shy away from a challenge.
Summer of 2019 one of the highly skilled teams faced the challenge of placing 6×225 ducts, 500m in an arc, under two roads, two rivers and a brook.
Part of the Triton Knoll infrastructure project, the ducts are to carry high voltage power cables.
The team took on the challenge and completed the task in good time with zero environmental harm.
Using the trailing pipe method, all the compound curves were kept in place and the pipes all safely inserted.
Project Details
DATE
September 2019
CLIENT
J Murphy and Sons
PROJECT TYPE
Power Cables
Project Gallery
Get A Quote Today
[contact-form-7 id=”109″ /]